CCS RiskScore

Peer-reviewed risk assessment for Carbon Capture & Storage projects. Based on Mahjour et al. 2023 (CCS R&U review) and Mahjour et al. 2025 (Barnett Zero monitoring framework).

Site Characterization

Insufficient/Sparse Input Data

Per Mahjour et al. 2023: sparse subsurface data is the #1 site characterization risk. Look at core data density, well log coverage, and lab measurements.

Reservoir Structural Characteristics

3D seismic, fault mapping, formation discontinuities. Critical for understanding plume migration pathways.

Caprock Integrity

Insufficient caprock characterization is a primary leakage pathway risk. Need permeability, capillary entry pressure, and lateral continuity data.

Penetrations & Legacy Wells

Per EPA Class VI / Rule 5.203: all penetrations must be identified. Unresolved positional errors in legacy datasets are a documented risk in the literature.

Modeling Oversimplifications

Upscaling errors due to heterogeneity are a published R&U source. Multiscale modeling is the recommended mitigation.

Seismic Interpretation Quality

Incorrect wave arrival picks and noise on receiver arrays are documented risks. Deep learning–assisted interpretation is the literature recommendation.

Groundwater Baseline

Per Mahjour et al. 2025 (Barnett Zero study): post-injection baselines achieved statistical power of only 0.31–0.52. A pre-injection baseline is much stronger.

Operational

Mechanical Integrity Testing

Required under EPA Class VI and TX Rule 5.206. MIT detects unauthorized fluid migration.

Monitoring Network

Per Mahjour et al. 2025: 6-well networks at 0.25–2 mi achieved 0.31–0.52 power. Adequate detection generally needs 0.80 power.

Leakage Detection

Inaccurate leakage rate estimation is a documented risk. Advanced detection (e.g., surface flux, geochemical tracers, time-lapse seismic) is the recommendation.

Skilled Labor / Operator Training

Worker mistakes and skilled labor shortages are explicit operational R&U in the literature.

Induced Seismicity

Subsurface fluid injection is linked to induced seismicity in published studies (Vilarrasa 2019, Verdon 2014).

Financial

Capital Cost Estimate

CCS CAPEX overruns are widely documented. Higher AACE classification → lower uncertainty.

45Q / Incentive Eligibility

US 45Q credits are the primary revenue source for many CCS projects. Eligibility risk = revenue risk.

CO2 Offtake Agreement

Without secured CO2 volumes, project economics are speculative.

Political

Permit Status

Permit delays are the most common cause of CCS schedule slippage.

Jurisdictional Authority

State primacy generally accelerates permitting; non-primacy states route through EPA Region.

Tribal / Federal Land

Additional consultation requirements (NEPA, tribal consultation) add 6-18 months of schedule risk.

Social

Community Engagement

Public opposition has stopped multiple CCS projects (e.g., Barendrecht NL, Greenville OH).

Environmental Justice

EPA increasingly evaluates EJ impacts during Class VI review.

0 of 20 answered