CCS RiskScore
Peer-reviewed risk assessment for Carbon Capture & Storage projects. Based on Mahjour et al. 2023 (CCS R&U review) and Mahjour et al. 2025 (Barnett Zero monitoring framework).
Site Characterization
Per Mahjour et al. 2023: sparse subsurface data is the #1 site characterization risk. Look at core data density, well log coverage, and lab measurements.
3D seismic, fault mapping, formation discontinuities. Critical for understanding plume migration pathways.
Insufficient caprock characterization is a primary leakage pathway risk. Need permeability, capillary entry pressure, and lateral continuity data.
Per EPA Class VI / Rule 5.203: all penetrations must be identified. Unresolved positional errors in legacy datasets are a documented risk in the literature.
Upscaling errors due to heterogeneity are a published R&U source. Multiscale modeling is the recommended mitigation.
Incorrect wave arrival picks and noise on receiver arrays are documented risks. Deep learning–assisted interpretation is the literature recommendation.
Per Mahjour et al. 2025 (Barnett Zero study): post-injection baselines achieved statistical power of only 0.31–0.52. A pre-injection baseline is much stronger.
Operational
Required under EPA Class VI and TX Rule 5.206. MIT detects unauthorized fluid migration.
Per Mahjour et al. 2025: 6-well networks at 0.25–2 mi achieved 0.31–0.52 power. Adequate detection generally needs 0.80 power.
Inaccurate leakage rate estimation is a documented risk. Advanced detection (e.g., surface flux, geochemical tracers, time-lapse seismic) is the recommendation.
Worker mistakes and skilled labor shortages are explicit operational R&U in the literature.
Subsurface fluid injection is linked to induced seismicity in published studies (Vilarrasa 2019, Verdon 2014).
Financial
CCS CAPEX overruns are widely documented. Higher AACE classification → lower uncertainty.
US 45Q credits are the primary revenue source for many CCS projects. Eligibility risk = revenue risk.
Without secured CO2 volumes, project economics are speculative.
Political
Permit delays are the most common cause of CCS schedule slippage.
State primacy generally accelerates permitting; non-primacy states route through EPA Region.
Additional consultation requirements (NEPA, tribal consultation) add 6-18 months of schedule risk.
Social
Public opposition has stopped multiple CCS projects (e.g., Barendrecht NL, Greenville OH).
EPA increasingly evaluates EJ impacts during Class VI review.